-40%
100 HP VSD Rotary Screw Air Compressor 425-390 CFM 125 PSI 460V / 3 Phase / 60HZ
$ 11562.67
- Description
- Size Guide
Description
100 HP VSD Rotary Screw Air Compressor 425-390 CFM 125 -150 PSI 460V / 3 Phase / 60 HZModel: SC75V
Working pressure: 125-150PSI
Pressure :8Bar-10Bar
Airflow Volume:(CFM) 425-390
Power: 100 hp / 75 KW
Max :NPT 2"
Cooling: Air
Electric motor: 460V/60HZ/ 3 Phase
Warranty: 12 months
Dimension: 77*53*72 inch
Weight: 3637 lbs
Application:
Air Brushing,Blow Cleaning,Bolting/Wrenching,Brad Nailing/Stapling,Cutting,Drilling,Finish Nailing,Framing Nailing,Grinding,
HVLP Painting,Hobby Nailing,Hobby Painting,Inflation,Roof Nailing,Sanding,Spraying,Surface Prep
Garage & Industrial & Light Duty
Features a programmable control system
Reduces your air system footprint and allows for easy maintenance
Advantage:
1. Due to the constant temperature and low temperature operation, the non-wearing tooth profile and bearings have a service life of 80,000 hours.
2. High efficiency and energy saving, low speed during operation, large air volume, high air pressure and low noise.
3. For the high temperature environment in summer, a large-area plate heat exchanger is used
Caution:
Please read the operate manual carefully before start the compressor working
— Don’t dismantle any connector or equipment when machine is
running. Otherwise, the high-pressure gas and high temperature will
hurt you seriously.
— Please pay more attention to parts such as pump, oil tank and
pipelines, because they are high temperature when machine is running.
— Don’t try to change the working pressure rated . Because change
working pressure exceeding the rated range will cause machines to
overload and stop to work.
——
— Provide proper grounding connection for electric parts according
to electric security regulations. Use suitable wires matching the
working power, otherwise they will burnt out due to high temperature
or some other dangerous events occur.
— The compressed air for breathe use is prohibit.
Regular maintenance interval schedule:
Every 50 hours or weekly
--- Check oil level.
--- Check intake filter, if necessary clean it.
--- Drain condensation water from oil tank.
Every 500 hours
--- Check and adjust belt tension if necessary (belt driven only)
Every 2000 hours
--- Replace lubricants (for mineral lubricants oil)
--- Replace oil filter.
--- Replace intake filter
Every 4000 hours
--- Replace lubricants (for synthetic lubricants oil)
--- Replace oil separator
--- Clean cooler for dirt
Attention:
1、Replace filter element and lubricant after first 500 hours of operation.
2、Use incorrect lubricant oil and spare parts will cause compressor damage, only use original
manufacture oil and parts.
3、The service life of compressor depends on the environment conditions such as dust, vent etc.